Main accomplished and current objects of StroyCity in 2010-2024
Customer | ZapSibNeftekhim, LLC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Logistics complex of the New complex for the production of propylene by dehydrogenation of propane and propylene derivatives at ZapSibNeftekhim LLC (Logistics complex DGP-2) in Tobolsk, Tyumen region |
Fulfilment period | May 2024 – May 2026 |
Type of works | Full range of construction and installation works for the construction of the facility |
Customer | ZapSibNeftekhim, LLC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Installation of outdoor water supply and sewerage networks for general factory facilities at ZapSibNeftekhim LLC in Tobolsk, Tyumen region |
Fulfilment period | May 2024 – April 2026 |
Type of works | Replacement and installation of water supply and sewerage networks, site improvement |
Customer | Gazprom Neft Shelf, LLC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Technical re-equipment of the water treatment and reservoir-pressure maintenance systems of the Prirazlomnaya offshore ice-resistant fixed platform (phase 1), Varandey, Nenets Autonomous Okrug, Barents Sea |
Fulfilment period | August 2022 – August 2025 |
Type of works | Set of operations: modular structures design, manufacture and assembly, as well as commissioning works |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Complex for the production of aromatic hydrocarbons (aromatics production complex), phase 3.1, section 300, located on the territory of Gazpromneft Omsk Oil Refinery, JSC |
Fulfilment period | August 2022 – February 2025 |
Type of works | Set of operations: construction and assembly of process pipelines and equipment, commissioning works |
Customer | Gazprom-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Effluent facilities of Gazprom-ONPZ, JSC. Mechanical cleaning unit, Off-site utilities |
Fulfilment period | June 2021 – November 2023 |
Type of works | Installation of process pipelines (water supply and sewerage networks, heating networks, basic construction and installation, mechanical installation, commissioning) |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | “Effluent treatment facilities. Tank blocks. Substructures” situated within the territory of the operating plant Gazpromneft-ONPZ (JSC) |
Fulfilment period | November 2018 – November 2023 |
Type of works | Complex of construction and assembly works and start-up procedures on a turnkey basis of three tank farms; tanks volume range of 100 m3-20 000 m3. |
Customer | Gazprom-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Reconstruction of the delayed coking unit 21-10/3М (2nd and 3rd stages) (preparation period) (DCU) |
Fulfilment period | August 2020 – October 2022 |
Type of works | Mounting tanks, process pipelines, equipment, corrosion protection of the process pipelines, changing and laying water supply and sewerage pipelines, general construction works |
Customer | Gazprom-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Replacement of motor truck scales in the equipment fleet |
Fulfilment period | October 2021 – July 2022 |
Type of works | General construction works, erections of metal structures, and equipment assembly |
Customer | Gazprom-ONPZ, JSC |
---|---|
General Contractor | NIPIGAZ, JSC |
Object name and location | Complex or repair and installation works in accordance with the accepted engineering solutions for the heating of Interconnecting Utilities (projects of the Large-Scale Project Directorate) on the pipe racks TK5 and TK5.1, on the lines 1219,1222, sections TK5.1-TK-12-TK-16 of the line LC-1211, within the framework of the project “Construction of off-site facilities of the CDU-VDU Complex, DCU and DCC within the territory of the working factory of Gazpromneft-ONPZ JSC” (COR 189_2, COR 189_3, COR 310) |
Fulfilment period | August 2021 – October 2021 |
Type of works | Process pipeline installation |
Customer | Gazprom-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Repair and replacement of engineering utilities at the off-site facilities, Technical Control Laboratory, Chief Power Engineer Department, Administrative Economic Department and Commercial Production Department |
Fulfilment period | May 2021 – August 2021 |
Type of works | Replacement of industrial pipelines (engineering utilities and heat distribution network) |
Customer | Gazprom-ONPZ, JSC |
---|---|
General Contractor | NIPIGAS, JSC |
Contractor | StroyCity, LLC |
Object name and location | Re-equipment of the intermediate pressure steam piping within the framework of the campaign “Remedial measures complex aimed at the utilization of excess steam from the Advanced Oil Refining Complex considering no consumption by CDU/VDU and delayed coking unit” (stage 1: installation of process pipelines TK2 (section from the motor road 7х28 to 8х28), stage 2: installation of process pipelines TK2 (AD-9/Isomalk-2)) |
Fulfilment period | February 2021 – July 2021 |
Type of works | Steel structures assembly, installation of steam process pipelines and steam condensate lines, application of corrosion protection coating |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Technical re-equipment and partial replacement of the Aromatic Hydrocarbons Production Complex (KPA) (to insure the acceptance of benzene concentrate L-35/11-600), Gubkina Ave, 1 |
Fulfilment period | July 2020 – November 2020 |
Type of works | Construction, assembly and commissioning works on site |
Customer | Gazpromneft – Catalytic Systems, LLC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Laboratory and Analysis Complex, key production facilities and off-site facilities within the territory of the operating plant. Works in the Catalyst Testing Engineering Center |
Fulfilment period | June 2020 – April 2021 |
Type of works | Complex of construction and assembly works for the Center construction, including removal of utility networks, lightning pole installation, temporary power supply and utility networks installation |
Customer | Gazpromneft – Catalytic Systems, LLC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Laboratory and Analysis Complex, core production facilities and off-site facilities within the territory of the operating plant. Substructure and utilities. Initial-stage works |
Fulfilment period | December 2019 – February 2021 |
Type of works | Earthworks, piled foundation works |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Re-equipping oil tanks P-15 and P-16 for storage of winter diesel fuel for the needs of Gazpromneft-ONPZ, JSC |
Fulfilment period | November 2019 – June 2020 |
Type of works | Complex of construction and assembly works and start-up procedures, dismantling and mounting equipment and pipelines |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Arranging filtering circuit for filtering low-viscosity marine fuel |
Fulfilment period | November 2019 – May 2020 |
Type of works | Complex of construction and assembly works and start-up procedures, equipment mounting |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Sulfuric acid alkylation installation (25/12) Facilities No. 2 |
Fulfilment period | September 2019 – October 2019 |
Type of works | Repair of process equipment and pipelines during shutdown maintenance |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Complex of construction and assembly works and start-up procedures for the "Thermal power station-0.5 Hybrid output design" |
Fulfilment period | June 2019 – June 2020 |
Type of works | Complex of construction and assembly works and start-up procedures |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Complex of construction and assembly works and start-up procedures for the "Checkpoint for the construction site of catalysts production plant" |
Fulfilment period | June 2019 – November 2019 |
Type of works | Complex of construction and installation works |
Customer | Transneft-Zapadnaya Sibir, JSC |
---|---|
General Contractor | UralStroyNeft, LLC |
Object name and location | Pipeline remote pumping station "Isilkul-PP" Engineering and technical safety system. Reconstruction |
Fulfilment period | April 2019 – November 2019 |
Type of works | Complex of construction and assembly works on the vertical stainless steel tanks (РВС -10 000) № 7, 8, 13, 14 |
Customer | Transneft-Zapadnaya Sibir, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | GPHE "08-ТПР-005-011296". Trunk pipeline pumping station "Barabinsk". Construction works. |
Fulfilment period | April 2019 – September 2019 |
Type of works | Construction and assembly works |
Customer | Transneft-Zapadnaya Sibir, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | GPHE "08-ТПР-004-006995". The automation system of oil metering station No. 448. Omsk Regional Oil Pipeline Management. Omsk pipeline remote pumping station. Technical re-equipping. |
Fulfilment period | April 2019 – October 2019 |
Type of works | Technical re-equipping the automation system of oil metering unit |
Customer | Transneft-Zapadnaya Sibir, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | GPHE «08-ТПР-005-023024». Replacement of trunk pipeline station at the pipeline remote pumping station «Isilkul-PP» Kurgan oil pipeline management office. Technical re-equipping. GPHE «08-ТПР-005-023025». Leaks and drainage collecting and pumping system at the pipeline remote pumping station «Isilkul-PP». Kurgan oil pipeline management office. Technical re-equipping. |
Fulfilment period | March 2019 – October 2020 |
Type of works | Trunk pipeline station replacement. Leaks and drainage collecting and pumping system |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | Neftekhimremont, LLC |
Object name and location | Reconstruction of catalytic reforming unit L-35/11-600 |
Fulfilment period | August 2018 - April 2019 |
Type of works | Dismantling and installation works |
Customer | Gazpromneft – Catalytic Systems, LLC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Laboratory and Analysis Complex, core production facilities and off-site facilities on the territory of the Gazpromneft-ONPZ (JSC) operating plant |
Fulfilment period | August 2018 – June 2019 |
Type of works | Disassembly of building structures, underground utilities and metal structures. Complex of construction and assembly works and start-up and commissioning operations |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Replacement of outmoded equipment. Facilities No. 2. Upgrading the building of the combined operator room No. 1 (ZhM No. 84455) |
Fulfilment period | July 2018 |
Type of works | Complex of construction and assembly works and start-up procedures, equipment and C&I mounting |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | NIPIGAZ, JSC |
Contractor | StroyCity, LLC |
Object name and location | Off-plant facilities for the CDU/VDU, DCU and AORC operation on the territory of the Gazpromneft-ONPZ (JSC) operating plant |
Fulfilment period | November 2017 – December 2019 |
Type of works | Complex of construction and installation works for the preparation of the construction site and demolition of existing structures, installation of water supply and sewerage networks, piling works |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | NIPIGAZ, JSC |
Contractor | StroyCity, LLC |
Object name and location | Off-plant facilities for the CDU/VDU, DCU and AORC operation on the territory of the Gazpromneft-ONPZ (JSC) operating plant |
Fulfilment period | July 2018 – July 2019 |
Type of works | Complex of construction and installation works including corrosion protection of technological pipelines on pipe racks Pipeline tie-in works, repair of pile caps and columns of process trestle, modification of pipe racks |
Customer | Transneft – Zapadnaya Sibir, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Main pumping station “Barabinsk”, located on the Barabinsk pipeline remote pumping station (Barabinsk, Novosibirsk region) |
Fulfilment period | February 2019 – September 2019 |
Type of works | Construction and installation works including construction/dismantling of temporary buildings and structures. Exploration of foreign pipelines and nets crossing. On-site testing of diagnostic devices passing ability. Start-up and commissioning operations. Participation in complex testing of systems and equipment. |
Customer | Transneft – Zapadnaya Sibir, JSC |
---|---|
General Contractor | UralStroiNeft, LLC |
Contractor | StroyCity, LLC |
Object name and location | Vertical Stock Tank-10000 № 9, 10, 11, 12, Omsk District Oil Pipeline Agency, pipeline remote pumping station «OMSK» on the Omsk pipeline remote pumping station (Omsk) |
Fulfilment period | May 2018 – June 2019 |
Type of works | Construction and installation works including construction/dismantling of temporary buildings and structures. Exploration of foreign pipelines and nets crossing. On-site testing of diagnostic devices passing ability. Start-up and commissioning operations. Participation in complex testing of systems and equipment |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Replacement of worn-out equipment. Connection of pumping technological block-box to water and power supply systems, PCS and turnkey communication networks on the territory of the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | May 2018 – March 2019 |
Type of works | Design and survey works and construction and installation works including reconstruction, modernization and technical re-equipment of the facility. Industrial safety examination, registration of positive safety expert review in Rostekhnadzor, author’s supervision services provision |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Temporary helipad on the territory of the Gazpromneft-ONPZ (JSC) operating plant |
Fulfilment period | June 2018 – August 2018 |
Type of works | Complex of construction and assembly works and start-up and commissioning operations on a turn-key basis at three helipads, three parking areas and roads. Landscaping and gardening of the area of 8 hectares using roll and sown lawn |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | On-spot loading rack-2 on the pipe welding station-2 on the territory of the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | June 2017 – October 2018 |
Type of works | Development of the railroad facilities of the enterprise. Construction of non-public railway tracks for the on-spot loading rack-2 at the pipe welding station-2 of Gazpromneft-ONPZ, JSC. Construction of quiescent rail road-track scale at the on-spot loading rack-2 of Gazpromneft-ONPZ, JSC (construction, installation, commissioning works) |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | Gazprom Avtomatizatsiya, PJSC |
Object name and location | CDU/VDU complex located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | June 2017 – July 2019 |
Type of works | Complex of construction and installation works |
Customer | Gazpromneft-SM, JSC, OZSM |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Technical re-equipping. Renewal of reservoir No. 779 in the depot No. 1131. Unit No. 37/1-4” in the branch plant of Gazpromneft-SM, LLC, OZSM located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | June 2017 – December 2017 |
Type of works | Dismantling, assembly, construction, insulation, chemical protection, electrical installation works, external water and sewerage lines and wastes disposal |
Customer | Gazpromneft-SM, JSC, OZSM |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Technical re-equipping. Renewal of reservoir No. 854, 855 in the depot No. 193, reservoir No. 883 in the depot No. 1133 TF-3 in the branch plant of Gazpromneft-SM, LLC, OZSM |
Fulfilment period | June 2017 – December 2017 |
Type of works | Dismantling, assembly, construction, insulation, chemical protection, electrical installation works, external water and sewerage lines, control and measuring devices and automatic equipment, process control system, and wastes disposal |
Customer | Transneft – Zapadnaya Sibir, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Trunk pipeline pump station of pipeline remote pumping station “Omsk”. Construction. Equipment for trunk pipeline pump station No. 2. Replacement of main pump units No. 1, 2 and 3. Omsk Regional Oil Pipeline Management. Pipeline remote pumping station “Omsk”. Technical re-equipment located on the Omsk pipeline remote pumping station (Omsk) |
Fulfilment period | April 2017 – November 2017 |
Type of works | Construction and installation works (dismantling, installation of pipelines and pumping units) including the construction/dismantling of temporary buildings and structures; diagnostic devices testing; commissioning work including individual and functional testing |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Treatment unit of regeneration gases of catalytic cracking (works on demolition/dismantling of capital facilities and transfer of out-door plumbing system networks) on the territory of the Gazpromneft-ONPZ, JSC operating plant (Omsk, Gubkin Ave., 1) |
Fulfilment period | March 2017 – July 2017 |
Type of works | Dismantling of equipment and piping with partial saving of equipment and building constructions (potassing pumping house, foundations, compressor house), ferroconcrete fume stack 100 m high element-by-element (with 2 m rings) using diamond carving and lorry crane Liebherr LTM 1500 |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | OMUS-1, OJSC |
Object name and location | Automated installation of timed pouring No. 1 located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | October 2016 – August 2017 |
Type of works | Construction of the breast wall device, installation of fire tanks (monolithic bottom slabs, monolithic tank walls), installation of water supply and sewage networks. |
Customer | Gazpromneft-SM, LLC, OZSM |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Reconstruction of installation 36/1-1 for the production of softening oils like IDAE on the Gazpromneft-SM, LLC, OZSM operating plant. |
Fulfilment period | September 2016 – December 2016 |
Type of works | Dismantling of existing equipment and buildings, general construction works, mechanical installation works (technological equipment and piping), electrical works, instrumentation and control equipment, plant floor system, pre-commissioning activities, equipment supply. |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | OMUS-1, OJSC |
Object name and location | CDU/VDU complex located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | May 2016 – March 2017 |
Type of works | Ground works, pile works, foundation pour, backfill of pit hollows, mantling of water drawdown system. |
Customer | Omskiy kauchuk, PJSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Technical re-equipping of carbolic acid/acetone production section 101-105 located in the Omskiy kauchuk, PJSC operating plant. |
Fulfilment period | May 2016 – July 2019 |
Type of works | 1. Workshop 101-105. Demolition of the existing equipment supporting structure and foundation in view of pit excavation. Demolition works of the pump station on the axes 19-24 AB. Construction of new equipment supporting structures and foundations. Ground injection. Working period: May 2016 – September 2017 2. Control room. Preparation works (land works, crushed-stone bed and cement bed). Construction of the foundation plate MP-1. Construction of walls and columns. Construction of the floor slab panel MP-1. Installation of blastproof doors. Working period: October 2018 – July 2019 |
Customer | Gazpromneft, JSC |
---|---|
General Contractor | Petrostroy, LLC |
Object name and location | Improvement of Lenin street on the site from Partizanskaya street to Victory square (including the adjacent Dzerzhinsky square, the Academic Drama Theatre square and the Theatre garden), located at: Omsk, Lenin str. |
Fulfilment period | April 2016 – May 2016 |
Type of works | Installation of monolithic structures of stairwells with retaining wallsand monolithic structures of underground pedestrian crossing |
Customer | Gazpromneft-SM, JSC OZSM |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Local water unit for de-asphalting plants 36/1-1, 36/13, and 36/3-4 located at the Gazpromneft-ONPZ, JSC operating plant Gazpromneft-ONPZ, JSC |
Fulfilment period | October 2015 – December 2016 |
Type of works | Construction of pile bases, water supply and sewerage, cooling towers, industrial building, process pipe racks. General construction, electrical installation, construction and installation work. Equipment supply, start-up and commissioning works, installation of ventilation and heating systems, installation of water supply and sewerage networks, process pipelines and equipment installation, automation |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | GPE-6N (construction and installation commissioning activities) located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | April 2015 – February 2016 |
Type of works | Electric and general construction works, installation of ventilation and heating system, of water supply and sewerage networks, industrial pipelines and equipment, automation |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Reconstruction of installation CT 1/1 of section 100/200/300/400 on the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | March 2015 – September 2015 |
Type of works | Preparatory works, pile works, ground works, installation of monolithic instrument room, steel constructions installation, finishing works, electrical works, installation of water supply and sewage networks |
General Contractor | CC IdealStroy, LLC |
---|---|
Object name and location | Portal viewing platform with a stair descent to the embankment of Irtysh river. Chokan Valikhanov str, Omsk. |
Fulfilment period | July 2014 |
Type of works | Construction of monolithic ferroconcrete walls, floor slabs, stair flights. Electrical works |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Water unit for installations VAC-4 and 5 located at the GazpromneftONPZ, JSC operating plant |
Fulfilment period | February 2014 – June 2015 |
Type of works | Preparatory works, pile works, ground works, installation of concrete and ferroconcrete monolithic constructions, steel constructions and industrial pipelines installation, finishing works, electrical works, installation of water supply and sewage networks, instrumentation and control equipment |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Water unit for installations 43/103 located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | Апрель 2014 – декабрь 2015 г. |
Type of works | Preparatory works, pile works, ground works, installation of concrete and ferroconcrete monolithic constructions, steel constructions and industrial pipelines installation, finishing works, electrical works, installation of water supply and sewage networks, instrumentation and control equipment |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | OMUS-1, OJSC |
Object name and location | Terminal of gutter, storage and injection into processing of SGC located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | November 2013 – December 2014 |
Type of works | Construction of piled foundations, monolithic slabs, cable tray systems, WSS, buried tank, retaining wall |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Installation of hydrocracked VGO on the Gazpromneft-ONPZ (JSC) operating plant |
Fulfilment period | October 2013 – May 2014 |
Type of works | Dismantling of factory buildings, chimney, process pipe racks, reactor blocks, benches, tank farm, flare |
Customer | Gazpromneft-MNPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Section No. 16. Cooler No. 5 on water unit No. 5 located on the territory of the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | October 2013 – April 2014 |
Type of works | Construction and assembly of cooler steel constructions |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Plant office building, site improvements on the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | August 2013 – September 2015 |
Type of works | Decoration works, electrical works, heating radiators and fire alarm system replacement, facade repairing. Construction of underground water supply lines and canalization |
Customer | Omskiy kauchuk, PJSC |
---|---|
Object name and location | Local block of water reuse located at the Omskiy kauchuk, PJSC operating plant |
Fulfilment period | August 2013 – February 2014 |
Type of works | Construction of buried catch pit, piled foundations, WSS networks, foundations and flooring |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Objects of social and domestic sphere. D.M. Karbyshev Recreation Centre. Omsk region, Krasnoyarka village. |
Fulfilment period | May 2013 – May 2014 |
Type of works | Reconstruction of canteen building, bedroom building and club building |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Track scales on pouring dock tit. 8501 TSB-1 for weighting four-axle railway wagons located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | April 2013 – October 2013 |
Type of works | Installation of piled foundations, cable tray systems, floodlight towers, railway track and railway scales, landscaping, technological process control |
Customer | Omskiy kauchuk, PJSC |
---|---|
General Contractor | StroyCity, LLC |
Object name and location | Reconstruction of nitrogen and oxygen station and reconstruction of air separation section on the Omskiy kauchuk, PJSC operating plant |
Fulfilment period | December 2012 – June 2014 |
Type of works | Construction of piled foundation, installation of WSS networks, construction of foundations, steelwork erection, assembling of sandwich panels, brickwork of internal partitions, flooring, landscaping |
Customer | Gazpromneft-SM, LLC, OZSM |
---|---|
General Contractor | OMUS-1, OJSC |
Object name and location | Automatic oil mixture station with a capacity of 70 thousand tons per year located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | August 2012 – October 2013 |
Type of works | Construction of piled foundations, installation of WSS networks, construction of foundations for tanks and concrete dyking of tanks, landscaping |
Customer | Tobolsk-Polimer, LLC |
---|---|
General Contractor | The Linde Group |
Subcontractor | OMUS-1, JSC |
Object name and location | Installation of polypropylene production. Discharge zone (CA 31, CA 90) located at «Tobolsk-Polimer» operating plant |
Fulfilment period | May 2012 – May 2013 |
Type of works | Installation of foundations, floors, water supply and sewerage networks |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | Neftekhimremont, LLC |
Object name and location | Flyover of bitumen pouring into railway tanks. Installation 19/3 located at the Gazpromneft-ONPZ (JSC) operating plant |
Fulfilment period | March 2012 – July 2013 |
Type of works | Site preparation, structures dismantling, utility lines removal, construction works (ground works, installation of foundations, floors, water supply and canalization networks) |
Customer | Gazpromneft-MNPZ, JSC |
---|---|
General Contractor | OMUS-1, OJSC |
Object name and location | Integrated plant of gases desulphurization, MEA dip regeneration and production of free sulphur located at the Gazpromneft-MNPZ, JSC operating plant (Moscow city, Kapotnya, 2nd sect., bld. 1, block 3) |
Fulfilment period | September 2011 – August 2013 |
Type of works | Site preparation, structures dismantling, utility lines removal, construction works (ground works, installation of foundations, floors, water supply and canalization networks), landscaping |
Customer | Branch of Federal State Unitary Enterprise M.V. Khrunichev GKN PTs PA Polet |
---|---|
Object name and location | Monument to Omsk citizens, who greatly contributed to space exploration. Omsk city, Kosmicheskiy Ave., 17a |
Fulfilment period | November 2010 – July 2011 |
Type of works | General construction and installation works |
Customer | Gazpromneft-ONPZ, JSC |
---|---|
General Contractor | OMUS-1, OJSC, Genenergomontazh, LLC |
Object name and location | Complex of catalytic cracking naphtha and diesel fuels hydrotreater located at the Gazpromneft-ONPZ, JSC operating plant |
Fulfilment period | March 2010 – June 2012 |
Type of works | Preparation of the construction site, structures dismantling, utility systems removal, ground works, piling works, installation of concrete and ferroconcrete monolithic constructions and floors, precast ferroconcrete constructions assembly, steelwork erection and cooler construction |